Accurate, Valid, and Reliable in 20 Minutes or Less
With Amira ISIP Assess™, Amira proctors, observes, and scores by listening to students read aloud in English, Spanish, or both, taking the stress out of assessment for teachers and students.
Adaptive Assessments are Missing the Big Picture
-
Frustrated Students Just Click-Click-Click
Adaptive assessments take too long to proctor and create stress for struggling readers and advanced students end up bored and speed-click their way through the endless screens.
-
Without Integrated Voice AI, Inequities Persist
Students at risk require an understanding of diverse speech including accents and dialects. Amira uniquely analyzes oral reading down to the phoneme level.
-
Disconnected Data Delays Action
When assessment isn’t designed to inform instruction, teachers spend valuable time trying to make meaning and connect it to instruction. Plus, students have a harder time understanding how instruction connects to their areas for growth.
Faster, More Accurate Assessment Designed for How the Brain Learns
Amira ISIP Assess™ listens as students read aloud, capturing and analyzing sounds to generate insights that reflect real skill development and reading growth.





As students read aloud, Amira listens and measures skills through oral reading, capturing miscues and patterns. To students, it feels like practice, not a test.
Amira analyzes every word read aloud, detecting errors with expert accuracy and identifying early indicators of reading risk.
Anchored in reading development research, Amira measures skills that truly matter and mirrors how the brain learns to read.
Amira keeps students in the proximal zone, maintaining accuracy across all ability levels and minimizing frustration and test fatigue.
Amira surfaces real-time insights teachers can use to identify student needs instantly including reading difficulties and risk.
360° View of Every Student’s Reading Journey
Amira ISIP Assess™ is a benchmark assessment, dyslexia screener, and progress monitor—all in one. Amira does the heavy lifting, then gives you a 360-degree view of each student’s data tied to actionable recommendations.
Amira combines benchmark assessment, universal screening, dyslexia screen, and progress monitoring all in one solution and just a 20-minute oral reading session.
Amira listens as each student reads aloud and responds and can capture, analyze, and score everything in the moment.
Amira goes beyond scoring, mapping student needs to instruction, intervention, and tutoring across the strands of the Reading Rope.
Amira continuously adjusts to each student’s reading ability, alerting teachers of student struggles and moments to celebrate, encouraging powerful reading growth.




Modern Psychometrics Meets Neuroscience
Amira uses advanced, modern psychometrics to assess reading development and decades of neuroscience research to enable reliable assessment for every student, including pre-readers.
Psychometric Innovation
- Adjusts the difficulty and type of tasks students engage with in real time
- Item Response Theory ensures precise measurement at every ability level
- Continuous calibration maintains accuracy as students progress
Neuroscience Foundation
- Analyzes phonological processing and decoding as students read aloud
- Orthographic mapping tracks how students connect letters to sounds
- Measures comprehension through vocabulary and response patterns
- Cognitive tasks surface executive function traits like attention and working memory
A Dashboard for Every Role
Amira delivers continuously updated reports and immediate next steps, helping administrators and teachers make informed decisions in literacy instruction.
Admin Dashboard
Central hub for monitoring usage, progress, and growth across schools and classrooms.
- District- and school-level controls
- Full visibility into implementation
- Data views from district to student
Progress Report
Detailed insight into individual reading performance with scored transcripts and playback.
- Reveal growth patterns through transcripts and audio playback
- Highlight accuracy, fluency, and error patterns
- Share audio with families to illustrate student growth
Standards Mastery Report
Granular view of student progress tied to your state’s reading standards.
- MAST score shows mastery of state standards
- Track development by standard and skill
- Support planning and instructional decisions
Student Summary Report
Comprehensive snapshot of student performance across all reading domains.
- Show growth across all Reading Rope domains
- Support RTI and MTSS decisions
- See performance, rank, progress, and risk at a glance
Top-Rated for Accuracy, Reliability, and Validity by NCII
Amira ISIP Assess™ earned the highest possible ratings from the National Center on Intensive Intervention, validating that Amira meets the most rigorous standards in reading assessment.
- 30+State Approvals Meeting rigorous standards.
- 5Sole State-Selected Screener Georgia, New Mexico, Oklahoma, Idaho and Mississippi.
- #1NCII Highest Ratings For accuracy, reliability, and validity.
- >.80Sensitivity & Specificity Across all student groups.
Accurate Reading Assessment for Every Student
100% Spanish Equivalence
A truly authentic Spanish assessment, not just a translation.
Authentic Language Passes
Students engage with naturally structured, culturally relevant text.
Proven Accuracy Across All Student Groups
Achieves >0.8 specificity and sensitivity for precise risk identification.
Family Reports in Dual Languages
Keeps families informed with multilingual assessment results in English and Spanish.
Paper/Pencil Option Available
Flexibility for students needing non-digital alternatives, including braille.
TPRI
Amira is the digital provider of the TPRI assessment, developed by the University of Texas Health Science Center at Houston and the Children’s Learning Institute. Amira Assess can deliver the TPRI assessment, in the form approved by the TEA and other state agencies.
Frequently Asked Questions
Amira proctors, observes, and scores by listening to students read aloud, observing oral reading behaviors (miscues, pauses, and self-corrections) to deliver a diagnostic picture of reading mastery, aligned with Scarborough’s Reading Rope and the Active View of Reading.
Yes. Amira is approved in 39 states and has received top ratings from organizations like the NCII and Deal Center. Amira is the sole state-selected screener in GA, NM, OK, and ID, and is recognized for accurate risk identification in CA, GA, and MA.
Amira is the digital provider of the TPRI assessment, developed by the University of Texas Health Science Center at Houston and the Children’s Learning Institute. Amira Assess can deliver the TPRI assessment, in the form approved by the TEA and other state agencies.
Amira can assess an entire class in 20 minutes. Students simply read aloud, and Amira captures 10x more measurement points than traditional assessments without the test-taking stress.
Amira generates real-time, curriculum-coherent instructional recommendations. Teachers get clear next steps connected to core curriculum and aligned to standards through dynamic dashboards.
Yes. Amira offers authentic Spanish assessment, not just translated, and evaluates across dialects and accents down to the phoneme level.
See Amira ISIP Assess in Your District
Amira ISIP Assess is adopted by districts and schools. Tell us where you are and we will show you a twenty-minute assessment with your own students’ standards behind it.
Explore the Amira Reading Suite Learn more about the science powering Amira Review student data privacy & security policies